Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Appareils - Base de donnée » Installations dans le monde

  120-FUC CairnGorm Funicular

Car near the valley station
Car near the valley station

Car descending to the valley
Car descending to the valley

Summer stop at Ptarmigan
Summer stop at Ptarmigan

Informations générales  
Station Reindeer House 
resort CairnGorm Mountain 
Region Écosse 
Pays   
Nom de la remontée CairnGorm Funicular 
Type 120-FUC 
Constructeur de l'installation Doppelmayr 
Année de construction 2001 
Commissioning date 23 Dec 2001 


Informations pour personnes à mobilité réduite
Fully accessible to wheelchair users. Bottom and Top Stations have lift access to all facilities.

Particularités
The CairnGorm Funicular is just under 2km in length, the majority is carried on a concrete viaduct, but the top 350m is in a tunnel. The haul rope is complimented by a lower tension rope and a short section of track between the bottom and middle station has a shallow reverse gradient.

The middle station is not at the passing loop, thus the Funicular must stop twice if both the up car and down car are picking up or dropping off passengers. This increases journey time from 3.5min (full speed) to around 7 to 8minutes.

Incorporated in the Top Station is the Ptarmigan Restaurant, Mountain viewing terrace, Mountain Exhibition and Shop.

The wide 2m track gauge is due to the high winds that often affect CairnGorm Mountain. The Funicular is permitted to operate for uplifting skiers in wind speeds up to 70mph (112km/h). It can be used for evacuation in higher wind speeds at reduced line speed.

The highest wind speed recorded at the Tunnel Mouth since opening is 176mph (284km/h).

The CairnGorm Funicular made it's inaugural journey on 23rd December 2001, 40 years to the day that the White Lady Chairlift (which the Funicular replaced) was inaugurated. The first full day of public operation was Christmas Day 2001.

The Funicular was a direct replacement for the White Lady and Carpark Chairlifts (1960s 2-CLD side facing GMD Mueller chairs).

Outwith the ski season the Funicular operates in a 'closed system' and the funicular can not be used to access the Summit Plateau, however walkers and climbers who make their own way up the mountain may take the Funicular down.

During the ski season the funicular provides access to the high level nursery slopes at the top of the ski area as well as uplift for the mid and lower slopes.

The total cost of installation was £19.5million but around 1/3rd of the cost went on environmental impact mitigation. In some cases tower founds had to be dug by hand to avoid damage to sensitive peat bogs which are home to rare plants. Rocks with rare lichens and mosses had to be photographed, numbered, carefully stored and the returned to the same location they were removed from after construction!

geometric data  
Altitude aval 645 m
Altitude intermédiaire(s) 760 m
Altitude amont 1097 m
Vertical rise 453 m
Route distance 1970 m
Longueur horizontale ?? m
Pente moyenne 23 %
Pente maximale 40 %
Trackwidth drive ?? m
Trackwidth line 2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Débit maximum 1200 Pers/h
Travel time 3,5 min
Driving speed line 10,0 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Puissance du moteur (au démarrage) ?? kW
Puissance du moteur (en service) ?? kW
Puissance de freinage ?? kW
Continuous brake power ?? kW
gare motrice gare amont 
Type d'entraînement ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Type de pinces ?? 
Constructeur des véhicules Gangloff 
Type de véhicules ?? 
Siège ne pas 
Seat heater Non 
Heater ?? 
climatiseur ?? 
Nombre de places par véhicules 120 
Nombre total de véhicules 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope gare aval 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Durée de construction 30 mois
Saison d’exploitation ❄ ☀ à l'année 
Type of turnout ?? 
Integrated rescue system ?? 
Téléphérique autonome Non 
Asset number (Trail map) ?? 

Vous devez être identifié pour pouvoir consulter cette information !


Support
Wrong data or something is missing?
Nous soutenir!
Updates
Données: 25 Apr 2023
Photos: ??

Statistiques de l'installation
15434 visit(s) since 22 Sept 2003
Dernière visite 8 Sept 2025

LIFT-WORLD IDs
Lift-ID: 1220
Station-ID: 323

https://www.seilbahntechnik.net/fr/lifts/1220/datas.htm