Lift-Database » Lifts in the world
2-MGD Eckbauerbahn

| General information | |
|---|---|
| Place | Garmisch-Partenkirchen |
| resort | Zugspitze |
| Region | Bavaria |
| Country | |
| Name of lift | Eckbauerbahn |
| Type | 2-MGD |
| Lift manufacturer | Pohlig |
| Year of construction | 1956 |
| Commissioning date | Dec 23, 1956 |
| Date of closing down | Oct 8, 2018 |
| Date of pull down | 10 / 2018 |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| nothing |
| geometric data | |
|---|---|
| Height of valley station | 730 m |
| Height of mountain station | 1230 m |
| Vertical rise | 500 m |
| Route distance | 2140 m |
| Horizontal length | ?? m |
| Average incline | ?? % |
| Largest incline | ?? % |
| Number of pillars | 27 Stk |
| Greatest spanwidth | ?? m |
| Max ground clearance | ?? m |
| Trackwidth drive | ?? m |
| Trackwidth line | ?? m |
| Trackwidth return | ?? m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | ?? m |
| Maximum capacity | 300 Pers/h |
| Travel time | 14 min |
| Driving speed line | 2,5 m/s |
| Driving speed station | ?? m/s |
| electrical data | |
|---|---|
| Electrical control | ?? |
| Remote control and telemonitoring system | ?? |
| Power control system | ?? |
| Number of drive | ?? Stk |
| Drive power (Start) | ?? kW |
| Drive power (Operation) | 80 kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Mountain station |
| Drive type | ?? |
| Traction of drive | ?? |
| Emergency drive | ?? |
| Traction of emergency drive | ?? |
| cabins data | |
|---|---|
| Grip type | ?? |
| Cab manufacturer | ?? |
| Cab model | ?? |
| Seating | none |
| Seat heater | no |
| Heater | ?? |
| Aircon | ?? |
| Persons per cab | 2 |
| Number of cabs | 75 Stk |
| Cab distance | ?? m |
| Cab interval | ?? s |
| Garage type | ground floor |
| Garage place | valley and mountain |
| Garage direction | ?? |
| Loading direction | ?? |
| rope data | |
|---|---|
| Rope manufacturer | ?? |
| Length of haul rope | ?? m |
| Total weight of haul rope | ?? t |
| Haul rope diameter | 27 mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | Valley station |
| Tension type | rope tension weight |
| Tension way | ?? m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | 100 % |
| Drive direction | left |
| Construction costs | ?? |
| Currency (Construction costs) | ?? |
| Construction period | ?? months |
| Seasontime | ❄ ☀ all-season |
| Evacuation ropeway | no |
| Integrated rescue system | no |
| Rope position control | no |
| Autonomous ropeway | no |
| Asset number (Trail map) | ?? |
Updates
Datas: Nov 6, 2018
PHOTOS: ??
Lift-Statistics
31886 visit(s) since Feb 27, 2003
Last visit Oct 24, 2025
LIFT-WORLD IDs
Lift-ID: 867
Place-ID: 157
https://www.seilbahntechnik.net/en/lifts/867/datas.htm
Datas: Nov 6, 2018
PHOTOS: ??
Lift-Statistics
31886 visit(s) since Feb 27, 2003
Last visit Oct 24, 2025
LIFT-WORLD IDs
Lift-ID: 867
Place-ID: 157
https://www.seilbahntechnik.net/en/lifts/867/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands
