Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Mutta Rodunda

Valley station
Valley station

Valley station
Valley station

Inside the valley station
Inside the valley station

General information  
Place Flims 
resort LAAX 
Region Grisons 
Country   
Name of lift Mutta Rodunda 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2005 
Commissioning date 2005 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1900 m
Height of mountain station 2435 m
Vertical rise 535 m
Route distance 2089 m
Horizontal length 2008 m
Average incline 27 %
Largest incline 77 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 7,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 794 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 131 Stk
Cab distance 34 m
Cab interval 6,8 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 4245 m
Total weight of haul rope 54 t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 10 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period 7 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/10/22
PHOTOS: ??

Lift-Statistics
15004 visit(s) since 26/07/05
Last visit 12/10/24

LIFT-WORLD IDs
Lift-ID: 7384
Place-ID: 257

https://www.seilbahntechnik.net/en/lifts/7384/datas.htm