Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  31-AT Albino - Selvino

Line
Line

Valley Station
Valley Station

Valley Station
Valley Station

General information  
Place Albino 
resort ?? 
Region Lombardia 
Country   
Name of lift Albino - Selvino 
Type 31-AT 
Lift manufacturer Agudio 
Year of construction 1957/201 
Commissioning date 1958 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 418 m
Height of middle station(s) ?? m
Height of mountain station 954 m
Vertical rise 535 m
Route distance 2902 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 4 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 250 Pers/h
Travel time 8 min
Driving speed line ?? m/s
Speed on towers ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 201 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab 31 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 12 months
Seasontime ??  
Carrying rope brake ?? 
Moving platform ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27 ene 2018
PHOTOS: ??

Lift-Statistics
7953 visit(s) since 20 feb 2005
Last visit 17 jun 2025

LIFT-WORLD IDs
Lift-ID: 5538
Place-ID: 1280

https://www.seilbahntechnik.net/en/lifts/5538/datas.htm