Lift-Database » Lifts in the world
4-CLF Kopfbergbahn
Valley station
Mountain station
Valley Station
General information | |
---|---|
Place | Annaberg im Lammertal |
resort | ?? |
Region | Salzburg |
Country | |
Name of lift | Kopfbergbahn |
Type | 4-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 2000 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 777,00 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1063,30 m |
Vertical rise | 286,30 m |
Route distance | 1050,28 m |
Horizontal length | ?? m |
Average incline | 28,33 % |
Largest incline | 55,13 % |
Number of pillars | 10 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,8 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1594 Pers/h |
Travel time | 6,75 min |
Driving speed line | 2,6 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 232 kW |
Drive power (Operation) | 184 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | Icolan |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 90 Stk |
Cab distance | 23,49 m |
Cab interval | 9,04 s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 38 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 6 months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Asset number (Trail map) | A1 |
Updates
Datas: 01/11/23
PHOTOS: ??
Lift-Statistics
15980 visit(s) since 09/09/03
Last visit 20/01/25
LIFT-WORLD IDs
Lift-ID: 540
Place-ID: 348
https://www.seilbahntechnik.net/en/lifts/540/datas.htm
Datas: 01/11/23
PHOTOS: ??
Lift-Statistics
15980 visit(s) since 09/09/03
Last visit 20/01/25
LIFT-WORLD IDs
Lift-ID: 540
Place-ID: 348
https://www.seilbahntechnik.net/en/lifts/540/datas.htm