Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Grand Paradis

Line
Line

Middle station
Middle station

Middle station
Middle station

General information  
Place Champéry 
resort Portes du Soleil 
Region Vaud 
Country   
Name of lift Grand Paradis 
Type 6-CLD 
Lift manufacturer Garaventa 
Year of construction 2004 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1030 m
Height of middle station(s) ?? m
Height of mountain station 1817 m
Vertical rise 787 m
Route distance 1630 m
Horizontal length 14,57 m
Average incline ?? %
Largest incline 98,79 %
Number of pillars 19 Stk
Greatest spanwidth 148, m
Max ground clearance 18 m
Trackwidth drive 4,7 m
Trackwidth line 6,0 m
Trackwidth return 5,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 5,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 742 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 51 Stk
Cab distance 67,5 m
Cab interval 13,5 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 3393 m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 2061 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 4,7 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09.08.2025
PHOTOS: ??

Lift-Statistics
11042 visit(s) since 22.12.2004
Last visit 29.08.2025

LIFT-WORLD IDs
Lift-ID: 5264
Place-ID: 2199

https://www.seilbahntechnik.net/en/lifts/5264/datas.htm