Lift-Database » Lifts in the world
4-CLF Forsteralmbahn

General information | |
---|---|
Place | ?? |
resort | Forsteralm |
Region | Upper Austria |
Country | ![]() |
Name of lift | Forsteralmbahn |
Type | 4-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 2004 |
Commissioning date | ?? |
Date of closing down | 2022 |
Date of pull down | 2023 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 680,85 m |
Height of mountain station | 931,0 m |
Vertical rise | 250,15 m |
Route distance | 964,23 m |
Horizontal length | 927,0 m |
Average incline | 26,98 % |
Largest incline | 54,04 % |
Number of pillars | 11 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,8 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2013 Pers/h |
Travel time | 6,18 min |
Driving speed line | 2,60 m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 252 kW |
Drive power (Operation) | 205 kW |
Brake power | -150 kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | 4FG |
Cab manufacturer | Doppelmayr |
Cab model | 4E98/A Fix |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 105 Stk |
Cab distance | 18,6 m |
Cab interval | 7,15 s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 2070 m |
Total weight of haul rope | 10,8675 t |
Haul rope diameter | 38 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | 4 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | 6 months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: May 14, 2024
PHOTOS: ??
Lift-Statistics
8254 visit(s) since Mar 19, 2005
Last visit Apr 29, 2025
LIFT-WORLD IDs
Lift-ID: 4773
Place-ID: 133
https://www.seilbahntechnik.net/en/lifts/4773/datas.htm
Datas: May 14, 2024
PHOTOS: ??
Lift-Statistics
8254 visit(s) since Mar 19, 2005
Last visit Apr 29, 2025
LIFT-WORLD IDs
Lift-ID: 4773
Place-ID: 133
https://www.seilbahntechnik.net/en/lifts/4773/datas.htm