Lift-Database » Lifts in the world
2-SL Mutkogllift



| General information | |
|---|---|
| Place | Soelden |
| resort | Oetztaler Superskipass |
| Region | Tyrol |
| Country | |
| Name of lift | Mutkogllift |
| Type | 2-SL |
| Lift manufacturer | Doppelmayr |
| Year of construction | 1981/26 |
| Commissioning date | ?? |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| Relocation of the valley station over the years due to glacier retreat. This continued until the route was shortened to include a midway station, which served as the starting point during the ‘glacier autumn’ as the valley station could not be reached on skis. 2026: Shortening on the lower end of the lift. The previous technical specifications are as follows: - Valley station altitude: 2,790 m - Length: 2,150 m - Capacity: 1,435 p/h - Speed: 3.5 m/s - Journey time: 9.5 min - Control system: ELIN - Number of bars: 174 Another new feature is that the mountain station is now under CCTV-surveillance and is therefore not constantly staffed. |
| geometric data | |
|---|---|
| Height of valley station | ?? m |
| Height of mountain station | 3229 m |
| Vertical rise | ?? m |
| Route distance | 859 m |
| Horizontal length | ?? m |
| Average incline | ?? % |
| Largest incline | ?? % |
| Number of pillars | ?? Stk |
| Trackwidth drive | ?? m |
| Trackwidth line | ?? m |
| Trackwidth return | ?? m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | ?? m |
| Maximum capacity | 1097 Pers/h |
| Travel time | 4,7 min |
| Driving speed line | 3,0 m/s |
| electrical data | |
|---|---|
| Electrical control | ?? |
| Remote control and telemonitoring system | ?? |
| Power control system | ?? |
| Number of drive | 1 Stk |
| Drive power (Start) | ?? kW |
| Drive power (Operation) | ?? kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Valley station |
| Drive type | electrical |
| Traction of drive | ?? |
| cabins data | |
|---|---|
| Grip type | ?? |
| Cab manufacturer | Doppelmayr |
| Cab model | ?? |
| Persons per cab | 2 |
| Number of cabs | ?? Stk |
| rope data | |
|---|---|
| Rope manufacturer | ?? |
| Length of haul rope | ?? m |
| Total weight of haul rope | ?? t |
| Haul rope diameter | ?? mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | ?? |
| Tension type | ?? |
| Tension way | ?? m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | ?? % |
| Drive direction | right |
| Construction costs | ?? ATS |
| Currency (Construction costs) | Austrian schilling |
| Construction period | ?? months |
| Seasontime | ❄ winter |
| Autonomous ropeway | no |
| Asset number (Trail map) | E67 |
Updates
Datas: 14.09.2026
PHOTOS: ??
Lift-Statistics
23824 visit(s) since 11.09.2004
Last visit 03.10.2026
LIFT-WORLD IDs
Lift-ID: 42
Place-ID: 1
https://www.seilbahntechnik.net/en/lifts/42/datas.htm
Datas: 14.09.2026
PHOTOS: ??
Lift-Statistics
23824 visit(s) since 11.09.2004
Last visit 03.10.2026
LIFT-WORLD IDs
Lift-ID: 42
Place-ID: 1
https://www.seilbahntechnik.net/en/lifts/42/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands

