Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLD Hahnenköpfle

Valley station
Valley station

Line
Line

Line
Line

General information  
Place Hirschegg 
resort ?? 
Region Vorarlberg 
Country   
Name of lift Hahnenköpfle 
Type 2-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1978 
Commissioning date 12 / 1978 
Date of closing down 06/04/17 
Date of pull down 06/04/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1560 m
Height of mountain station 2029 m
Vertical rise 463,5 m
Route distance 1960,8 m
Horizontal length 1886 m
Average incline 24,58 %
Largest incline 51,10 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1480 Pers/h
Travel time 8,17 min
Driving speed line 3,7 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 522 kW
Drive power (Operation) 436 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type VR102 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 226 Stk
Cab distance 18 m
Cab interval 4,86 s
Garage type emergency rail 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/10/23
PHOTOS: ??

Lift-Statistics
15430 visit(s) since 10/08/03
Last visit 29/04/24

LIFT-WORLD IDs
Lift-ID: 396
Place-ID: 2054

https://www.seilbahntechnik.net/en/lifts/396/datas.htm