4-CLF Koblat
Line
Line
Mountain Station
General information | |
---|---|
Place | Oberstdorf |
resort | Nebelhorn |
Region | Bavaria |
Country | |
Name of lift | Koblat |
Type | 4-CLF |
Lift manufacturer | Leitner |
Year of construction | 1996 |
Commissioning date | 1996 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | 1905 m |
Height of mountain station | 2100 m |
Vertical rise | 195 m |
Route distance | 739,71 m |
Horizontal length | ?? m |
Average incline | 28 % |
Largest incline | 66 % |
Number of pillars | 9 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,3 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2400 Pers/h |
Travel time | 5,16 min |
Driving speed line | 2,4 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 178 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | hydraulic |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Leitner |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 102 Stk |
Cab distance | 14,6 m |
Cab interval | 6,1 s |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | 1500 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 38 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? DEM |
Currency (Construction costs) | Deutsche Mark |
Construction period | 4,5 months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 12/09/22
PHOTOS: ??
Lift-Statistics
11943 visit(s) since 05/12/02
Last visit 08/06/24
LIFT-WORLD IDs
Lift-ID: 331
Place-ID: 152
https://www.seilbahntechnik.net/en/lifts/331/datas.htm
Datas: 12/09/22
PHOTOS: ??
Lift-Statistics
11943 visit(s) since 05/12/02
Last visit 08/06/24
LIFT-WORLD IDs
Lift-ID: 331
Place-ID: 152
https://www.seilbahntechnik.net/en/lifts/331/datas.htm