Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Alpspitzbahn Sektion 1

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Nesselwang 
resort ?? 
Region Bavaria 
Country   
Name of lift Alpspitzbahn Sektion 1 
Type 1-CLF 
Lift manufacturer Heuss 
Year of construction 1950/06 
Commissioning date ?? 
Date of closing down 10 / 2020 
Date of pull down 2021 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The chairlift was shortened in 2006 because of the new combined lift. The current mountain station was the middle station at the time. Leitner mountain station. Before abbreviation: 13 supports and 113 armchairs.
Closed after the 2020 summer season.

geometric data  
Height of valley station 912 m
Height of mountain station 1020 m
Vertical rise 150 m
Route distance 630 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 315 Pers/h
Travel time 5 min
Driving speed line 1,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 24 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period ?? months
Seasontime summer 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/10/24
PHOTOS: ??

Lift-Statistics
16720 visit(s) since 05/05/03
Last visit 31/10/24

LIFT-WORLD IDs
Lift-ID: 326
Place-ID: 177

https://www.seilbahntechnik.net/en/lifts/326/datas.htm