Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Rifenalbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Landeck-Zams 
resort ?? 
Region Tyrol 
Country   
Name of lift Rifenalbahn 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1997 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
2024: refurbishment
summer operations in 2024 and 2025

geometric data  
Height of valley station 954 m
Height of mountain station 1768 m
Vertical rise 814 m
Route distance 2130 m
Horizontal length ?? m
Average incline 43,10 %
Largest incline 64,30 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1582 Pers/h
Travel time 7,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system Leitner 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 98 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 4750 m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 2 apr 2025
PHOTOS: ??

Lift-Statistics
5917 visit(s) since 26 set 2003
Last visit 9 mag 2025

LIFT-WORLD IDs
Lift-ID: 3183
Place-ID: 470

https://www.seilbahntechnik.net/en/lifts/3183/datas.htm