Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Gratlbahn



General information  
Place Soelden 
resort Oetztaler Superskipass 
Region Tyrol 
Country   
Name of lift Gratlbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2026 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2127,0 m
Height of mountain station 2536,5 m
Vertical rise 409,5 m
Route distance 1128,34 m
Horizontal length 1044,07 m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,40 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2300 Pers/h
Travel time 4,18 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D3000 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab 6 
Number of cabs 53 Stk
Cab distance 46,96 m
Cab interval 9,39 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Autonomous ropeway yes 
Asset number (Trail map) A16 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28 Oct 2026
PHOTOS: ??

Lift-Statistics
16 visit(s) since 18 Sept 2026
Last visit 29 Oct 2026

LIFT-WORLD IDs
Lift-ID: 26946
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/26946/datas.htm