Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Mitterhausalm I



General information  
Place Schladming 
resort ?? 
Region Styria 
Country   
Name of lift Mitterhausalm I 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2025 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1332,5 m
Height of mountain station 1598,50 m
Vertical rise 265,5 m
Route distance 795,94 m
Horizontal length 736,00 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,7 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 (3000) Pers/h
Travel time 2,92 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) 508 kW
Drive power (Operation) 409 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 31 (36) Stk
Cab distance 60,92 (52,80) m
Cab interval 11,07 (9,60) s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Autonomous ropeway ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26 Oct 2025
PHOTOS: ??

Lift-Statistics
215 visit(s) since 19 Oct 2025
Last visit 28 Oct 2025

LIFT-WORLD IDs
Lift-ID: 26004
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/26004/datas.htm