Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Keetley Express



General information  
Place Park City 
resort ?? 
Region Utah 
Country   
Name of lift Keetley Express 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2024 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
carrier garage follows in the future

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 381 m
Route distance 2034 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time ?? min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type D3000 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? USD
Currency (Construction costs) United States dollar 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13.04.2025
PHOTOS: ??

Lift-Statistics
607 visit(s) since 18.09.2023
Last visit 30.04.2025

LIFT-WORLD IDs
Lift-ID: 24850
Place-ID: 161

https://www.seilbahntechnik.net/en/lifts/24850/datas.htm