Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Galtbergbahn










General information  
Place Fulpmes 
resort Schlick 2000 
Region Tyrol 
Country   
Name of lift Galtbergbahn 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2023 
Commissioning date 08/12/23 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1305,5 m
Height of mountain station 1761,0 m
Vertical rise 455,5 m
Route distance 1436 m
Horizontal length 1352 m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 (2000) Pers/h
Travel time 4 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - Evo Xline deep 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 23 (33) Stk
Cab distance 124,8 m
Cab interval 20,8 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope 28 t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/06/24
PHOTOS: ??

Lift-Statistics
1508 visit(s) since 18/09/23
Last visit 14/10/24

LIFT-WORLD IDs
Lift-ID: 23113
Place-ID: 70

https://www.seilbahntechnik.net/en/lifts/23113/datas.htm