Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Lac Noir-Chaux Ronde



General information  
Place Villars-sur-Ollon 
resort Villars-Gryon 
Region Vaud 
Country   
Name of lift Lac Noir-Chaux Ronde 
Type 8-CLD 
Lift manufacturer Garaventa 
Year of construction 2022 
Commissioning date 03/12/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1721 m
Height of mountain station 1980 m
Vertical rise 259 m
Route distance 944 m
Horizontal length 898 m
Average incline 28,9 %
Largest incline 79,8 %
Number of pillars 10 Stk
Greatest spanwidth 174, m
Max ground clearance 22,1 m
Trackwidth drive 7,7 m
Trackwidth line 7,7 m
Trackwidth return 7,7 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 1984 m
Maximum capacity 4000 Pers/h
Travel time 3,63 min
Driving speed line 5,0 m/s
Driving speed station 1,0 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system Frey 
Power control system Frey 
Number of drive 1 Stk
Drive power (Start) 511 kW
Drive power (Operation) 421 kW
Brake power 339 kW
Continuous brake power 339 kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D5000 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 60 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 1962 m
Total weight of haul rope 17,2 t
Haul rope diameter 48 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 1869 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 3,0 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/05/24
PHOTOS: ??

Lift-Statistics
1955 visit(s) since 29/10/22
Last visit 10/12/24

LIFT-WORLD IDs
Lift-ID: 21876
Place-ID: 2313

https://www.seilbahntechnik.net/en/lifts/21876/datas.htm