Lift-Database » Lifts in the world

  10-MGD Söllereck

Valley Station
Valley Station

Middle Station
Middle Station

Line
Line

General information  
Place Oberstdorf 
resort Nebelhorn 
Region Bavaria 
Country   
Name of lift Söllereck 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2020 
Commissioning date 21/05/21 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 990,7 m
Height of middle station(s) 1007,5 m
Height of mountain station 1357,5 m
Vertical rise 366,8 m
Route distance 2286,22 m
Horizontal length 2249,33 m
Average incline ?? %
Largest incline 45,9 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 8,42 min
Driving speed line 6 m/s
Driving speed station 0,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 794 kW
Drive power (Operation) 650 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 71 Stk
Cab distance 90 m
Cab interval 15 s
Garage type ground floor 
Garage place Middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 4500 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/09/21
PHOTOS: ??