Lift-Database » Lifts in the world

  10-MGD Salvistabahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Itter 
resort ?? 
Region Tyrol 
Country   
Name of lift Salvistabahn 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019/20 
Commissioning date 2020 


Infos for handicapped persons
Sorry, no information available.

Characteristics
middelstation at the Kraftalm

geometric data  
Height of valley station 669 m
Height of middle station(s) 1353 m
Height of mountain station 1560 m
Vertical rise 894 m
Route distance 2781 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2090 Pers/h
Travel time 10,1 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 70 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 15 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 30 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/02/24
PHOTOS: ??

Lift-Statistics
4432 visit(s) since 09/12/20
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 20467
Place-ID: 77

https://www.seilbahntechnik.net/en/lifts/20467/datas.htm