Lift-Database » Lifts in the world

  10-MGD Skyvall



General information  
Place Gouaux-de-Larboust 
resort ?? 
Region Midi-Pyrénées 
Country   
Name of lift Skyvall 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 24/08/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
LPA-XL grips.
Leitner Direct Drive LD10/19.

geometric data  
Height of valley station 965 m
Height of mountain station 1609 m
Vertical rise 644 m
Route distance 3106 m
Horizontal length 3024 m
Average incline 21,30 %
Largest incline 62,70 %
Number of pillars 23 Stk
Greatest spanwidth 211 m
Max ground clearance 22 m
Trackwidth drive 4,90 m
Trackwidth line 6,10 m
Trackwidth return 4,90 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 800 (2000) Pers/h
Travel time 8,6 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 882 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model DIAMOND - C10D210 
Seating carpet 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 27 (66) Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 2060 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 10 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/05/20
PHOTOS: ??

Lift-Statistics
1711 visit(s) since 23/05/20
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 19929
Place-ID: 1166