Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Ariondaz

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Courchevel 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Ariondaz 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 2017 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1592 m
Height of mountain station 2048 m
Vertical rise 456 m
Route distance 2376 m
Horizontal length ?? m
Average incline 19,23 %
Largest incline 49,60 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 6,6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 794 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-L 
Cab manufacturer Sigma 
Cab model DIAMOND - C8S190 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 86 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 50 m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/05/20
PHOTOS: ??

Lift-Statistics
2980 visit(s) since 04/05/20
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 19607
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/19607/datas.htm