Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Chamois



General information  
Place Megève 
resort Evasion Mont Blanc 
Region Rhône-Alpes 
Country   
Name of lift Chamois 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 2017 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1103 m
Height of mountain station 1299 m
Vertical rise 196 m
Route distance 1258 m
Horizontal length 1239 m
Average incline 16 %
Largest incline 51 %
Number of pillars 13 Stk
Greatest spanwidth 195 m
Max ground clearance 41 m
Trackwidth drive 3,05 m
Trackwidth line ?? m
Trackwidth return 4,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1750 Pers/h
Travel time 4,27 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive ?? Stk
Drive power (Start) 281 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - C6reno 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 55 Stk
Cab distance 60 m
Cab interval 12 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/05/23
PHOTOS: ??

Lift-Statistics
2531 visit(s) since 03/05/20
Last visit 18/04/24

LIFT-WORLD IDs
Lift-ID: 19604
Place-ID: 1128

https://www.seilbahntechnik.net/en/lifts/19604/datas.htm