Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLD Grisch-La Siala




Pillar
Pillar

Valley station
Valley station

General information  
Place Flims 
resort LAAX 
Region Grisons 
Country   
Name of lift Grisch-La Siala 
Type 3-CLD 
Lift manufacturer Habegger 
Year of construction 1982 
Commissioning date ?? 
Date of closing down 04 / 2014 
Date of pull down 04 / 2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2228 m
Height of mountain station 2813 m
Vertical rise 585 m
Route distance 2226 m
Horizontal length ?? m
Average incline 27,5 %
Largest incline 64,9 %
Number of pillars 25 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 10,0 min
Driving speed line 3,7 m/s
Driving speed station ?? m/s

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 515 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer von Roll 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 216 Stk
Cab distance 22 m
Cab interval 5,9 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/06/24
PHOTOS: ??

Lift-Statistics
17738 visit(s) since 05/06/03
Last visit 13/10/24

LIFT-WORLD IDs
Lift-ID: 1758
Place-ID: 257

https://www.seilbahntechnik.net/en/lifts/1758/datas.htm