Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Ritzhagen










General information  
Place Willingen 
resort ?? 
Region Hesse 
Country   
Name of lift Ritzhagen 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2013 
Commissioning date 26.01.2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 580 m
Height of mountain station 690 m
Vertical rise 110 m
Route distance 630,7 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2050 (3000) Pers/h
Travel time 2,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model CS10 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 29 (43) Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type station circulation 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12.12.2024
PHOTOS: ??

Lift-Statistics
12630 visit(s) since 18.12.2013
Last visit 30.04.2025

LIFT-WORLD IDs
Lift-ID: 17137
Place-ID: 282

https://www.seilbahntechnik.net/en/lifts/17137/datas.htm