Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Sonnenbahn Speiereck

Valley Station
Valley Station

Valley Station
Valley Station

General information  
Place St. Michael im Lungau 
resort Lungo 
Region Salzburg 
Country   
Name of lift Sonnenbahn Speiereck 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2011 
Commissioning date 12 / 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1080 m
Height of mountain station 1900 m
Vertical rise 820 m
Route distance 1819 m
Horizontal length ?? m
Average incline 40 %
Largest incline 66 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 7,33 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Carvatech 
Cab model ULTRA 8 Update 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 60 Stk
Cab distance 86,4 m
Cab interval 14,4 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 3 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 1 mars 2025
PHOTOS: ??

Lift-Statistics
11958 visit(s) since 2 déc. 2011
Last visit 30 avr. 2025

LIFT-WORLD IDs
Lift-ID: 15512
Place-ID: 350

https://www.seilbahntechnik.net/en/lifts/15512/datas.htm