Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Alp Giop










General information  
Place St. Moritz 
resort ?? 
Region Grisons 
Country   
Name of lift Alp Giop 
Type 4-CLD 
Lift manufacturer Garaventa 
Year of construction 1991 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
EX 4 CLD/B
Bubbles Removed around 2015

geometric data  
Height of valley station 2130,0 m
Height of middle station(s) ?? m
Height of mountain station 2688,50 m
Vertical rise 558,50 m
Route distance 2019,60 m
Horizontal length 1925,70 m
Average incline 28,50 %
Largest incline 68,60 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 6,80 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 590 kW
Drive power (Operation) 460 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type AK 4.1 
Cab manufacturer Garaventa 
Cab model 4E95 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 90 Stk
Cab distance 48 m
Cab interval 9,6 s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 4195 m
Total weight of haul rope 23,114 t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 4,0 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/08/24
PHOTOS: ??

Lift-Statistics
12179 visit(s) since 01/02/05
Last visit 30/10/24

LIFT-WORLD IDs
Lift-ID: 1529
Place-ID: 1726

https://www.seilbahntechnik.net/en/lifts/1529/datas.htm