Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Mechi Chal

Middle station
Middle station

Line
Line

Middle Station
Middle Station

General information  
Place Chepelare 
resort ?? 
Region Smolyan 
Country   
Name of lift Mechi Chal 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 2008 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle-Station

geometric data  
Height of valley station 1155 m
Height of middle station(s) 1525 m
Height of mountain station 1873 m
Vertical rise 718 m
Route distance 2795 m
Horizontal length 717 m
Average incline ?? %
Largest incline ?? %
Number of pillars 25 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 9,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 740 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 161 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??  
Situation of entrance parallel 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25.09.2010
PHOTOS: ??

Lift-Statistics
5951 visit(s) since 31.01.2009
Last visit 04.11.2025

LIFT-WORLD IDs
Lift-ID: 13611
Place-ID: 306

https://www.seilbahntechnik.net/en/lifts/13611/datas.htm