Lift-Database » Lifts in the world
6-CLD/B Holzalmbahn
Line
General information | |
---|---|
Place | Hochfuegen |
resort | Snow Card Tirol |
Region | Tyrol |
Country | |
Name of lift | Holzalmbahn |
Type | 6-CLD/B |
Lift manufacturer | Leitner |
Year of construction | 2001 |
Commissioning date | 2001 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | 1471 m |
Height of mountain station | 2170 m |
Vertical rise | 699 m |
Route distance | 1934 m |
Horizontal length | ?? m |
Average incline | 39,39 % |
Largest incline | 70,96 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,3 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2000 (2400) Pers/h |
Travel time | 6,5 min |
Driving speed line | 5 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Elin |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 789 kW |
Drive power (Operation) | 677 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Leitner |
Cab model | ?? |
Bubble colour | neutral |
Seating | Icolan |
Seat heater | no |
Persons per cab | 6 |
Number of cabs | 71 (90) Stk |
Cab distance | ?? m |
Cab interval | 10,8 (9,0) s |
Garage type | underground |
Garage place | mountain station |
Garage direction | forward |
Loading direction | backward |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | 31,687 t |
Haul rope diameter | 45 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ winter |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 01/01/24
PHOTOS: ??
Lift-Statistics
25580 visit(s) since 28/11/02
Last visit 06/12/24
LIFT-WORLD IDs
Lift-ID: 132
Place-ID: 149
https://www.seilbahntechnik.net/en/lifts/132/datas.htm
Datas: 01/01/24
PHOTOS: ??
Lift-Statistics
25580 visit(s) since 28/11/02
Last visit 06/12/24
LIFT-WORLD IDs
Lift-ID: 132
Place-ID: 149
https://www.seilbahntechnik.net/en/lifts/132/datas.htm