130-FUC Hungerburgbahn
General information | |
---|---|
Place | Innsbruck |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Hungerburgbahn |
Type | 130-FUC |
Lift manufacturer | Leitner |
Year of construction | 2006 |
Commissioning date | 01/12/07 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 569 m |
Height of middle station(s) | 560/750 m |
Height of mountain station | 860 m |
Vertical rise | 287 m |
Route distance | 1843 m |
Horizontal length | 1797 m |
Average incline | 16 % |
Largest incline | 47 % |
Trackwidth drive | 3,2 m |
Trackwidth line | 1,4 m |
Trackwidth return | 1,4 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | 860 m |
Maximum capacity | 1300 Pers/h |
Travel time | 6,1 min |
Driving speed line | 10 m/s |
electrical data | |
---|---|
Electrical control | Leitner |
Remote control and telemonitoring system | SISAG |
Power control system | Siemens |
Number of drive | 4 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 1800 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | nonexistent |
Traction of emergency drive | nonexistent |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Carvatech |
Cab model | ?? |
Seating | carpet |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 130 |
Number of cabs | 2 Stk |
Carriage Operator | yes |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | 1850 m |
Length of counter-rope | 1850 m |
Total weight of haul rope | 10,6 t |
Total weight of counter-rope | 5,3 t |
Haul rope diameter | 39 mm |
Counter-rope diameter | 28 mm |
Nominal strength of haul rope | 1960 N/mm² |
Nominal strength of counter-rope | 1960 N/mm² |
Breaking strength of rope | 1155 kN |
Breaking strength of counter-rope | 545 kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | 4 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 24 months |
Seasontime | ❄ ☀ all-season |
Type of turnout | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 11/08/22
PHOTOS: ??
Lift-Statistics
26522 visit(s) since 18/11/07
Last visit 14/10/24
LIFT-WORLD IDs
Lift-ID: 12195
Place-ID: 448
https://www.seilbahntechnik.net/en/lifts/12195/datas.htm
Datas: 11/08/22
PHOTOS: ??
Lift-Statistics
26522 visit(s) since 18/11/07
Last visit 14/10/24
LIFT-WORLD IDs
Lift-ID: 12195
Place-ID: 448