Lift-Database » Lifts in the world
8-MGD Ponte di Legno - Colonia Vigili

Line

Middle Station
| General information | |
|---|---|
| Place | Ponte di Legno |
| resort | ?? |
| Region | Lombardia |
| Country | |
| Name of lift | Ponte di Legno - Colonia Vigili |
| Type | 8-MGD |
| Lift manufacturer | Leitner |
| Year of construction | 2006 |
| Commissioning date | ?? |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| Number of cabins: both sections together |
| geometric data | |
|---|---|
| Height of valley station | 1253 m |
| Height of mountain station | 1640 m |
| Vertical rise | 387 m |
| Route distance | 2616 m |
| Horizontal length | ?? m |
| Average incline | ?? % |
| Largest incline | ?? % |
| Number of pillars | 19 Stk |
| Greatest spanwidth | ?? m |
| Max ground clearance | ?? m |
| Trackwidth drive | ?? m |
| Trackwidth line | ?? m |
| Trackwidth return | ?? m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | ?? m |
| Maximum capacity | 1800 Pers/h |
| Travel time | 7 min |
| Driving speed line | 6,0 m/s |
| Driving speed station | ?? m/s |
| electrical data | |
|---|---|
| Electrical control | Leitner |
| Remote control and telemonitoring system | ?? |
| Power control system | ?? |
| Number of drive | 2 Stk |
| Drive power (Start) | ?? kW |
| Drive power (Operation) | 740 kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Mountain station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| Emergency drive | ?? |
| Traction of emergency drive | ?? |
| cabins data | |
|---|---|
| Grip type | LPA |
| Cab manufacturer | Sigma |
| Cab model | DIAMOND - C8D210 |
| Seating | leather |
| Seat heater | no |
| Heater | ?? |
| Aircon | ?? |
| Persons per cab | 8 |
| Number of cabs | 120 Stk |
| Cab distance | ?? m |
| Cab interval | ?? s |
| Garage type | ?? |
| Garage place | mountain station |
| Garage direction | ?? |
| Loading direction | ?? |
| rope data | |
|---|---|
| Rope manufacturer | ?? |
| Length of haul rope | ?? m |
| Total weight of haul rope | ?? t |
| Haul rope diameter | ?? mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | Valley station |
| Tension type | hydraulical (controlled) |
| Tension way | ?? m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | 100 % |
| Drive direction | right |
| Construction costs | ?? |
| Currency (Construction costs) | ?? |
| Construction period | ?? months |
| Seasontime | ❄ ☀ all-season |
| Evacuation ropeway | ?? |
| Integrated rescue system | ?? |
| Rope position control | ?? |
| Autonomous ropeway | no |
| Asset number (Trail map) | ?? |
Updates
Datas: 25 ott 2025
PHOTOS: ??
Lift-Statistics
9258 visit(s) since 28 lug 2007
Last visit 25 ott 2025
LIFT-WORLD IDs
Lift-ID: 11754
Place-ID: 1531
https://www.seilbahntechnik.net/en/lifts/11754/datas.htm
Datas: 25 ott 2025
PHOTOS: ??
Lift-Statistics
9258 visit(s) since 28 lug 2007
Last visit 25 ott 2025
LIFT-WORLD IDs
Lift-ID: 11754
Place-ID: 1531
https://www.seilbahntechnik.net/en/lifts/11754/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands
