Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Alpette

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Oz-en-Oisans 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Alpette 
Type 12-MGD 
Lift manufacturer Poma 
Year of construction 1988 
Commissioning date 1988 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1367 m
Height of middle station(s) ?? m
Height of mountain station 2045 m
Vertical rise 677 m
Route distance 1950 m
Horizontal length ?? m
Average incline 36 %
Largest incline 91 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 6,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 650 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating none 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 12 
Number of cabs 36 Stk
Cab distance 135 m
Cab interval 27 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/04/24
PHOTOS: ??

Lift-Statistics
10535 visit(s) since 14/07/05
Last visit 09/06/24

LIFT-WORLD IDs
Lift-ID: 7254
Place-ID: 1157

https://www.seilbahntechnik.net/en/lifts/7254/datas.htm