Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Siódemka



General information  
Place Krynica-Zdrój 
resort ?? 
Region Lesser Poland 
Country   
Name of lift Siódemka 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2023 
Commissioning date 15/01/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1070 m
Height of mountain station 1113 m
Vertical rise 53 m
Route distance 393 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A104 
Cab manufacturer Doppelmayr 
Cab model 4E98/B 
Bubble colour blue 
Seating leather 
Seat heater ?? 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? PLZ
Currency (Construction costs) Polish złoty 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit ?? 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/24
PHOTOS: ??

Lift-Statistics
483 visit(s) since 18/09/23
Last visit 08/06/24

LIFT-WORLD IDs
Lift-ID: 24021
Place-ID: 905

https://www.seilbahntechnik.net/en/lifts/24021/datas.htm