Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Kandahar Express


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
midway unloading

General information  
Place Garmisch-Partenkirchen
resort
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Kandahar Express 
Type 4-CLD/B 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1170 m
Height of middle station(s) 1511,5 m
Height of mountain station 1707,5 m
Vertical rise 537,5 m
Route distance 1445 m
Horizontal length 1312 m
Average incline 41 %
Largest incline 98 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1700 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 2900 m
Total weight of haul rope 22 t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 484 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating leather
Seat heater yes
Persons per cab
Number of cabs 74 Stk
Cab distance 42 m
Cab interval 8,4 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 5 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance 90°
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 22/02/14 15:44:00
PHOTOS: 26/06/15 21:29:56

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8935 visit(s) since 17/09/09
Last visit 22/08/19

LIFT-WORLD IDs
Lift-ID: 14065
Place-ID: 157

https://www.seilbahntechnik.net/en/lifts/14065/datas.htm