General information  
Place Åre 
resort ?? 
Region Jämtland County 
Country   
Name of lift VM8:an 
Type 8/8-CGD 
Lift manufacturer Leitner 
Year of construction 2006 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
64 chairs /16 gondolas &\r\nhigh-capacity loading

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 455 m
Route distance 1485 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3400 Pers/h
Travel time 4,57 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 760 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - C8D210 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab 8/8 
Number of cabs 64/16 Stk
Cab distance 42 m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 3150 m
Total weight of haul rope 32 t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 07/06/15
PHOTOS: ??

Lift-Statistics
13250 visit(s) since 10/02/07
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 10931
Place-ID: 2091