Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Mitterhausbahn

Line
Line

Line
Line

Line
Line

General information  
Place Schladming 
resort ?? 
Region Styria 
Country   
Name of lift Mitterhausbahn 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1535,8 m
Height of mountain station 1865,05 m
Vertical rise 329,2 m
Route distance 1126 m
Horizontal length ?? m
Average incline 29,22 %
Largest incline 60,8 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 3,83 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system Leitner 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 487 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour yellow 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 57 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/01/24
PHOTOS: ??

Lift-Statistics
30690 visit(s) since 24/10/10
Last visit 08/10/24

LIFT-WORLD IDs
Lift-ID: 14928
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/14928/datas.htm