Warning: mysql_result(): supplied argument is not a valid MySQL result resource in /www/htdocs/v074506/content/lifte/liftdetails.php on line 163

Warning: mysql_result(): supplied argument is not a valid MySQL result resource in /www/htdocs/v074506/content/lifte/liftdetails.php on line 174

Warning: mysql_result(): supplied argument is not a valid MySQL result resource in /www/htdocs/v074506/content/lifte/liftdetails.php on line 185

Warning: mysql_result(): supplied argument is not a valid MySQL result resource in /www/htdocs/v074506/content/lifte/liftdetails.php on line 196
Lift-World :: Lift database : CairnGorm Mountain - CairnGorm Funicular - 120-SSB
Lift-World.info
Lifttechniek beweegt ons!
de en fr it cs nl  
Lift zoeken in
de hele tekst:

Uitgebreid zoeken
Lift-World
Login
Login-Naam:
Wachtwoord:

Advertentie
Lift database
Details over de Lift

Aanklikken om te vergroten!
Line

Aanklikken om te vergroten!
Upper half of Funicular Track


 Stemsysteem:
 Stemuitslag (Liftcomfort): 
 Gegeven stemmen: 6

 Stemmen





  Informatie voor gehandicapten:
Fully accessible to wheelchair users. Bottom and Top Stations have lift access to all facilities.

 
 Algemeen:
 Plaats (Liftonderneming): CairnGorm Mountain
 Land: GB
 Liftnaam: CairnGorm Funicular
 Type: 120-SSB
 Lift Producent: Doppelmayr
 Bouwjaar: 2001

 Technische details:
 Hoogte Talstation: 645 m
 Hoogte tussenstation(en): 760 m
 Hoogte Bergstation: 1097 m
 Hoogteverschil: 452 m
 lengte van de kabelbaan: 1982 m
 Horizontale Lengte: ?? m
 Gemiddelde steiging: 23 %
 Grootste neiging: 40 %
 Aantal Palen: 96 Stk
 spoorbreedte: 2 m
 Aandrijf station: Berg station
 Aanspanningsstation (spanning van de kabel): dalstation
 Type aanspanning: hydraulical (controlled)
 Spanweg: ?? m
 kabelproducent: ??
 Lengte van de kabel: ?? m
 Totaalgewicht kabel: ?? t
 Diameter van de kabel: ?? mm
 Elektische Techniek van: Frey
 Motorkracht (Anfahren): ?? kW
 Motorkracht (Betrieb): ?? kW
 Remkracht: ?? kW
 Klemmentyp: ????
 Wagon producent: Gangloff
 Wagonmodel: ????
 Stoelbekleding:  
 Stoelverwarming: Nee
 Aantal Wagons: 2 Stk
 Personen per Wagon: 120
 Maximale capiciteit: 1200 Pers/h
 reistijd: 3.5 to 8 min
 Snelheid kabelbaan : 10,0 m/s
 Transport naar de berg: 100 %
 Transport in het dal: 100 %
 Instapssituatie:  
 Uitstapssituatie:  
 Constructie periode: 30 Maanden

 Bijzonderheden:
The CairnGorm Funicular is just under 2km in length, the majority is carried on a concrete viaduct, but the top 350m is in a tunnel. The haul rope is complimented by a lower tension rope and a short section of track between the bottom and middle station has a shallow reverse gradient.

The middle station is not at the passing loop, thus the Funicular must stop twice if both the up car and down car are picking up or dropping off passengers. This increases journey time from 3.5min (full speed) to around 7 to 8minutes.

Incorporated in the Top Station is the Ptarmigan Restaurant, Mountain viewing terrace, Mountain Exhibition and Shop.

The wide 2m track gauge is due to the high winds that often affect CairnGorm Mountain. The Funicular is permitted to operate for uplifting skiers in wind speeds up to 70mph (112km/h). It can be used for evacuation in higher wind speeds at reduced line speed.

The highest wind speed recorded at the Tunnel Mouth since opening is 176mph (284km/h).

The CairnGorm Funicular made it's inaugural journey on 23rd December 2001, 40 years to the day that the White Lady Chairlift (which the Funicular replaced) was inaugurated. The first full day of public operation was Christmas Day 2001.

The Funicular was a direct replacement for the White Lady and Carpark Chairlifts (1960s 2-CLD side facing GMD Mueller chairs).

Outwith the ski season the Funicular operates in a 'closed system' and the funicular can not be used to access the Summit Plateau, however walkers and climbers who make their own way up the mountain may take the Funicular Down.

During the ski season the funicular provides access to the high level nursery slopes at the top of the ski area as well as uplift for the mid and lower slopes.

The total cost of installation was £19.5million but around 1/3rd of the cost went on environmental impact mitigation. In some cases tower founds had to be dug by hand to avoid damage to sensitive peat bogs which are home to rare plants. Rocks with rare lichens and mosses had to be photographed, numbered, carefully stored and the returned to the same location they were removed from after construction!

 
 Lift-Chronologie:
Deze informatie staat alleen tot beschikking van ingelogde leden!



Commentaren:

Commentaar schrijven:

U moet ingelogd zijn om een commentaar toe te voegen!




Updates:
Lift-Statistiek:
Details: 26.05.2008 21:54
3685 Bezoekers sinds... 22.09.2003
Fotos: 28.05.2008 20:13
Laatste bezoek om: 25.05.2012
 
Support:
Verkeerde informatie of mist er wat?
Help ons!
bronnen:
Bronnen van de bestanden.
bekijken >>>

Gebruik deze Link om naar deze webpagina te verwijzen:
http://www.seilbahntechnik.net/nl/lifts/1220/datas.htm