Lift-World.info
Ropeway technology moves us!
de en fr it cs nl  
Lift fulltext search:

Advanced search
Lift-World
Login
Login-Name
Password

Advertising
Knownledge & Technology
Ropeway construction

The construction of a funitel
02/14/2000: 
Gletscherbus III - Cab assembly

The cabs which were flown in by helicopter at 02/10/2000 from Hintertux to 2660m are transported with the excavator to the valley station.

Well it packs and protects - that nothing happens!
 

On a car the cabs are pulled into the valley station.

In the grip workshop the grip assembly lies ready ...
 

... for the assembly at the cab.

Everything is bolted and controlled!
 
 

Text / Photos: [Hintertuxer Gletscherbahn © 1999/2000 - www.hintertuxergletscher.at]

<< Back | Startpage | Overview of pages | Next >>