Lift-World.info
Ropeway technology moves us!
de en fr it cs nl  
Lift fulltext search:

Advanced search
Lift-World
Login
Login-Name
Password

Advertising
Lift-Database
Lift informations

Please klick to enlarge the it!
Line

Please klick to enlarge the it!
Valley Station

Please klick to enlarge the it!
Complete View of the lift

Show more photos...


 Votesystem:
 Vote (Travelling comfort): 
 Count of votes: 27

 Vote





  Infos for handicapped persons
Sorry, no information available.

 
 General information
 Place (skiresort) Nauders (Reschenpass)
 Country A
 Name of lift Zirmbahn
 Type 8-CLD
 Lift manufacturer Doppelmayr
 Year of construction 1999

 Technical data
 Height of valley station 2178 m
 Height of mountain station 2496 m
 Vertical rise 318 m
 Route distance 1159 m
 Horizontal length ?? m
 Average incline 28,70 %
 Largest incline 62,90 %
 Number of pillars 9 Stk
 Track width ?? m
 Driving station ????
 Tension station ????
 Tension type ????
 Tension way ?? m
 Rope manufacturer ??
 Length of rope ?? m
 Total weight of rope ?? t
 Rope diameter ?? mm
 Electrical engineering ??
 Drive power (Start) ?? kW
 Drive power (Operation) ?? kW
 Brake power ?? kW
 Grip type DT 108
 Chair manufacturer Doppelmayr
 Chair model 8E98
 Seat cover leather 
 Seat heater no
 Number of chairs 65 Stk
 Persons per chair 8
 Chair distance ?? m
 Chair interval ?? s
 Maximum capacity 3300 Pers/h
 Travel time 4,3 min
 Driving speed line 4,5 m/s
 Transport uphill 100 %
 Transport downhill ?? %
 Drive direction left
 Garage type underground
 Garage place Valley station
 Situation of entrance parallel 
 Situation of exit parallel 
 Loading carpet ????
 Construction period ?? Months

 Characteristics
nothing

 
 Lift-Chronology
This information are for members only visible!



Comments
11/06/2010 14:43Black
Erste 8-CLD Österreichs und den Alpen!!!

06/14/2009 11:09LK20
Geiler Funpark, geile Bahn

:D:D:D:D:D

01/25/2008 16:31Philipp
Erste 8-er KSB der Alpen!

02/15/2003 09:55Alex
Es war echt eine gute Überlegung, die ursprünglichen 2 parallel nebeneinander laufenden Schlepper durch den 8er zu ersetzen. Dadurch muss man nicht mehr so ewig warten und die Piste ist noch größer geworden.


Write a comment

You must be logged in to post messages!




Updates
Lift-Statistics
Datas 01/07/2012 10:40
4417 visit(s) since 03/09/2003
Photos 01/02/2004 12:30
Last visit 05/23/2012
 
Support
Wrong data or something is missing?
Support us!
Sources
Source info of the datas.
view >>>